| Brand Name: | Tube End Forming Die |
| Model Number: | Tube End Forming Die 001 |
| MOQ: | 10 PCS |
| Price: | Negotiate Price |
| Payment Terms: | T/T, D/A, D/P, L/C, Western Union, MoneyGram |
| Supply Ability: | 10000 pieces per month |
| Attribute | Value |
|---|---|
| Product Name | Tube End Forming Die Expansion and Swaging Tool Flaring Tool Expanding Tool Flare Tool Expansion Die Flaring Die shrinking Tool Shrinking Die Shrinkage Tool Pier Tube Die Pier Tube Tool |
| Material | YG8 |
| Specification | Φ3,Φ4,Φ4,76,Φ5,Φ6,Φ6.35,Φ7,Φ7.94,Φ9.53,Φ8.9,Φ12,Φ12.7,Φ14.5,Φ15.88 |
| Processing | Precision grinder fine grinding |
| Hardness | HRA 89°-92° |
| Quality | 100% Inspection |
| Surface Finish | Ra 0.2 |
| Surface Treatment | Mirror polishing or Coating |
| Service | OEM or ODM |
Our tube end forming die is crafted from premium tungsten steel (YG8) material, available as expansion dies, shrinking dies, and pier dies for pipes. Engineered for exceptional durability, these dies offer:
Φ3, Φ4, Φ4.76, Φ5, Φ6, Φ6.35, Φ7, Φ7.94, Φ9.53, Φ8.9, Φ12, Φ12.7, Φ14.5, Φ15.88
CNC Tube End Forming Machine, End forming machine with spinning mode, End forming machine with flinging mode, CNC Tube Integrated Machine(All In One), CNC Tube Integrated end forming Machine
Usage: Expanding, Shrinking or Pier Copper, Aluminum and Steel Tube
Guangzhou Runshi Mold Co., Ltd. specializes in precision machinery manufacturing, providing:
Tube End Forming Die Expansion Tool Flaring Tool Expanding Tool Flare Tool Expansion Die Flaring Die shrinking Tool Shrinking Die Shrinkage Tool Pier Tube Die Pier Tube Tool.
We are manufacturer.
It is an important end forming parts for CNC Tube End Forming Machine, End forming machine with spinning mode, End forming machine with flinging mode, CNC Tube Integrated Machine(All In One), CNC Tube Integrated end forming Machine, tube pier head machine.
We need to provide samples or drawings, one of which is sufficient. Our production engineers are professionals with over 10 years of experience, and they know how to control tolerances and precision.
Generally it is 5-10 working days if the goods are in stock. or it is 15-20 working days if the goods are not in stock, it is according to quantity.
Payment≤10000USD, 100% in advance. Payment>10000USD, 50% T/T in advance, balance before shipment.
For additional inquiries, please contact our technical sales team for prompt assistance.